7.2 Initial commissioning

For initial commissioning work to be carried out, the following prerequisites must be fulfilled and the 
preparatory tasks must have been completed.
Tools
No tool necessary
1.
Assembly of the QWIK‑PURE
Illustration
Prerequisites
Material
No material necessary
Preparatory tasks
is complete.
®
Commissioning work
Description / explanation
1. Remove the cover from the pressure relief
chamber and remove the activated carbon mat
from the vent of the pressure relief chamber.
2. Fill the pressure relief chamber with tap water
via the vent.
0 Stop filling it as soon as water comes out 
3. Insert the activated carbon mat into the vent of
the pressure relief chamber and place the cover
on the pressure relief chamber.
Protective equipment
Always to be worn:
from the condensate drain.