Toro 08120 Operator's Manual page 6

Heater kit workman utx utility vehicle
Table of Contents

Advertisement

10.
Plug the 5-terminal connector on the kit wire
harness into the back of the airflow switch
(Figure
9).
11.
Route the control cable, water valve, and wire
harness through the dashboard and secure the
control panel assembly onto the dashboard with
4 button-head bolts (5/8 inch) and 4 locknuts
(#10-24); refer to
3 N∙m (30 in-lb).
Figure 9
Figure
10. Torque the bolts to
Figure 10
g430409
g430435
6

Advertisement

Table of Contents
loading

Table of Contents