M OU NTI NG TH E GAT EWAY
When mounting the gateway onto a standard 35 mm DIN rail, end clamps should be mounted
on both sides of the module(s) to stop the modules from slipping on the DIN rail (see
4).
Modules are installed from left to right on the mounting rail. Install modules to mounting rail
as described in the following steps.
5. Attach the AWIN GW100 rev.2 to the mounting rail by positioning the keyway at the
top of the module onto the mounting rail (see Figure 5). Then rotate the module in-
ward until the DIN rail latch locks the module in place on the rail. Next, check that the
module is fixed securely to the rail by lightly pulling outward on the module.
26

Figure 4: Installation showing end clamps

Figure 5: Installing AWIN GW100 rev.2 on the DIN rail