Main Bearing, Crankshaft And Cylinder Block Removal And Installation - Suzuki GRAND VITARA 2005 Service Manual

Hide thumbs Also See for GRAND VITARA 2005:
Table of Contents

Advertisement

Main Bearing, Crankshaft and Cylinder Block
Removal and Installation
Removal
1) Remove piston and connecting rod referring to
"Piston, Piston Ring and Connecting Rod Removal
and Installation: ".
2) Remove heat exchanger referring to "Heat
Exchanger Removal and Installation: in Section 1E",
if necessary.
3) Loosen main bearing cap bolts in numerical order as
indicated in figure, and remove them.
4) Remove main bearing cap No.1 using special tool as
follows.
Special tool
(A): 09917–56510
a) Install special tool to main bearing cap No.1 (1).
b) Pull out main bearing cap No.1 from cylinder
block by tightening bolt (2) of special tool.
c) Remove main bearing cap from special tool.
5) Remove main bearing caps (No.2 through No.5) and
crankshaft from cylinder block.
S5JB0B1406066
6) Remove main bearings (1) and thrust bearings (2).
2
7) Disconnect fresh air vent hose (1), and remove oil
fresh air vent pipe (2) from cylinder block, if
necessary.
I5JB0B140112-01
I5JB0B140113-01
Engine Mechanical:
1
2
1D-56
I5JB0B140114-01
1
I5JB0B140115-01

Advertisement

Table of Contents
loading

Table of Contents