4
Installation
•
Attach the cable or device to the M12 connector on Tina.
•
Gently hold the Tina unit to the mounting surface and attach the unit using an M4 bolt.
•
See max. tightening torques in chapter "Technical data".
4.1
Installation precautions
Warning! All safety functions shall be tested before starting up the system.
4.2
Testing safety functions
After each step the status of the input can be read on the monitoring device.
Steps for testing
1. Interrupt the DYNlink safety
circuit before the unit to be
tested
2. Close the DYNlink safety
circuit
3. Interrupt the DYNlink safety
circuit (e.g. put a hand between
Orion receiver and transmitter)
2TLC010042M0201 Rev.C
LED indication
Green/red flashing
Green
Red
DYNlink signal output
Shall go low
Shall generate a DYNlink
signal
Shall go low
7