92 Mechanical installation
R6...R9: M8 (5/16 in)
2
×6
IP21 (UL Type 1)
6. Remove the front cover: Remove the fastening screws (a) with a T20 Torx
screwdriver, move the cover to the top side (b) and then up (c).
7. Attach the cable box to the drive frame.
8. Tighten the box bolts: three at the top (8a) and two at the bottom (8b). Also
tighten the bottom bolts started in step 3 (8c).
6b
6a
M8
3
× 2
7
6c
6a
4
× 2
M8
(5/16 in)
×6
5
8a
8c
8b