Komatsu PC220LC -8 Operation & Maintenance Manual page 224

Hydraulic excavator
Table of Contents

Advertisement

OPERATION
OPERATION
REMARK
When installing the bucket, for arm pin portion (A), fit O-ring (3) to
bucket (4) in the position shown in the diagram on the right. After
inserting the pin, fit it in the standard groove.
For link pin portion (B), install the bucket with O-ring (3) fitted in the
standard groove.
4. Install the stopper bolts and nuts for each pin, then grease the
pin.
REMARK
Lubricate with grease thoroughly until the grease comes out
from the end face.
When replacing the bucket, replace the dust seal if it has been
damaged. If a damaged seal is used without being replaced,
sand and dirt may enter the pin portion and cause abnormal
wear of the pin.
MACHINE OPERATIONS AND CONTROLS
MACHINE OPERATIONS AND CONTROLS
3 - 169

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc200lc-8Pc220-8Pc200-8

Table of Contents