Komatsu PC220LC -8 Operation & Maintenance Manual page 372

Hydraulic excavator
Table of Contents

Advertisement

ATTACHMENTS AND OPTIONS
Attachment Installation
1. Remove the bucket.
For bucket dismounting procedure, see "BUCKET REPLACEMENT AND INVERSION (PAGE 3-168)".
2. Place the attachment in a horizontal position, then install to the
arm with pin (A) and then pin (B).
3. Lower the attachment to the ground and stop the engine.
4. Turn the starting switch to the ON position (B), then set the lock
lever to the FREE position (F).
5. After carrying out Step 4, operate each work equipment control
lever and attachment control pedal fully to the front, rear, left,
and right 2 or 3 times within 15 seconds to release the internal
pressure in the hydraulic circuit.
6. Set the lock lever to LOCK position (L).
MACHINE READY FOR ATTACHMENT
6 - 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc200lc-8Pc220-8Pc200-8

Table of Contents