Installation Checklist; Contents Of This Chapter; Before You Start - ABB ACS880-77CC Hardware Manual

Wind turbine converters
Table of Contents

Advertisement

Installation checklist

Contents of this chapter

This chapter contains instructions for checking the installation of the wind turbine converter.

Before you start

Check the mechanical and electrical installation of the converter before start-up. Go through
the checklist together with another person.
WARNING!
Only qualified electricians are allowed to carry out the work described below. Do
the tasks described in the safety instructions of the converter. If you ignore them,
injury or death, or damage to the equipment can occur.
1.
Open the main disconnector of the converter and lock it to open position.
2.
Ensure by measuring that the converter is not powered.
Installation checklist 67
7

Advertisement

Table of Contents
loading

Table of Contents