Installation checklist
Contents of this chapter
This chapter contains instructions for checking the installation of the wind turbine converter.
Before you start
Check the mechanical and electrical installation of the converter before start-up. Go through
the checklist together with another person.
WARNING!
Only qualified electricians are allowed to carry out the work described below. Do
the tasks described in the safety instructions of the converter. If you ignore them,
injury or death, or damage to the equipment can occur.
1.
Open the main disconnector of the converter and lock it to open position.
2.
Ensure by measuring that the converter is not powered.
Installation checklist 67
7