Powering On Your System - NEC EXPRESS 5800 ES1400 SERIES Online Service Manual

Table of Contents

Advertisement

Powering On Your System

Power on your system as follows.
Make sure all external devices, such as a video display, keyboard, and mouse (optional) have
1.
been connected, and the power cords are connected.
2.
Power on the video display and any other external devices.
3.
Press the push-button power on/off switch on the front panel. Verify that the power-on LED is
lit. If it is not lit, ensure the ac power cords are connected to a functional ac power source.
After a few seconds your system begins the internal Power-On Self Tests (POST). POST
automatically checks the system board, CPU module, memory, keyboard, and most installed
peripheral devices.
Always allow POST to complete before powering down your system.
The server management logic on your system board monitors and logs system
voltage changes. When powering down your system you may experience a
1–5 second delay from the time you press the push-button power on/off switch on
the front panel and your system powering down. This is normal system operation
and is required by the server management logic.
If you have problems powering on your system, refer to
User's Guide.
After you have successfully powered on your system, insert the E
CD-ROM device, reboot the system and follow the screen prompts to run E
CAUTION
CAUTION
Problem Solving
in Chapter 5 of this
B
CD-ROM into the
XPRESS
UILDER
B
XPRESS
UILDER
Setting Up the System 2-11
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nec express5800 series

Table of Contents