3. At the front of the cabinet, slide the shelf unit all the way in.
4. In the locations shown in
inserting and tightening two 10-32 x 1/2-in. counter-sunk screws and lock washers
into each mounting flange on the shelf unit and into the cage nuts behind them.
Figure 2-7. Securing the Shelf Unit to the Front Rails
1
10-32 x 1/2-in. counter-sunk screws with lock washers
2
Mounting flange
Figure
2-7, secure the shelf unit to the vertical rails by
1
Installing a Rack-Mounted System
2
asys019
Installing a Rack-Mountable System
2-9