Sharp UP-600 Service Manual page 104

Sharp up-600 cash register service manual
Hide thumbs Also See for UP-600:
Table of Contents

Advertisement

(57) Place the insulating sheet and transistor on the main
PCB assembly, and fasten with the fastening screw
(M3x10).
Note:
When installing, bend the transistor legs
at a right angle, in alignment with the
soldering holes on PCB.
(58) Screw the nut (M3) on to the fastening screw (M3x10)
and fasten the FFC fixer plate.
Fastening screw
Transistor
Main frame assembly
Soldering holes
FFC fixer plate
Nut
Insulating sheet
Carriage
Main PCB assembly
Ceramic condenser
Transistor
Rectangular cutout
Dot pulse sensor
Fastening screw
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Up-700Dp-750

Table of Contents