Main unit
3
Operation panel lever ASSY disassembly (2)
1. Remove the 3 thumb bolts (M4L) 1, 3 spring washers (2-4) 2, and 3
plain washers (M4) 3.
2. Remove the retaining ring (E6), and then remove the 2 operation panel
lever shafts 4.
3. Remove operation panel lever A 6 and operation panel lever C 7 from
operation panel lever B 5.
4
Panel B support removal
1. Remove the 2 screws 1, and then remove the panel B support 1.
5
USB cord holder removal
1. Remove the 3 screws 1, and then remove the three USB cord holders 1.
Operation panel
4
1
2
3
7
3
2
1
5
6
Retaining ring E6
1
1
1
1
4
1
2
3
2 - 75