General Maintenance - Epson RC180 Safety And Installation

Hide thumbs Also See for RC180:
Table of Contents

Advertisement

5. General Maintenance

5. General Maintenance
This chapter describes maintenance inspections and procedures.
maintenance inspections and procedures properly is essential for preventing
trouble and ensuring safety.
Be sure to perform the maintenance inspections in accordance with the schedule.
5.1 Schedule for Maintenance Inspection
G / C3 / RS series
Inspection points are divided into five stages: daily, monthly, quarterly, biannual,
and annual. The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection
points must be added every 250 hours, 750 hours, 1500 hours, and 3000 hours
operation.
1 month(250 h)
2 months(500 h)
3 months(750 h)
4 months(1000 h)
5 months(1250 h)
6 months(1500 h)
7 months(1750 h)
8 months(2000 h)
9 months(2250 h)
10 months(2500 h)
11 months(2750 h)
12 months(3000 h)
13 months(3250 h)
h = hour
88
Daily
Monthly
Quarterly
Biannual
RC180 Safety and Installation Rev.18
Performing
Annual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rc170

Table of Contents