Perform Monthly Test (H1) - Panasonic EBL512 G3 User Manual

Fire alarm system
Hide thumbs Also See for EBL512 G3:
Table of Contents

Advertisement

Panasonic Eco Solutions Nordic AB
MEW01603 Rev: -
4
Menu
Escape
menu

Perform monthly test (H1)

Not possible for access level / type "Information only".
Press the Soft key "Menu".
With the keypad select 0, 1, 2 - - 8 or 9 for a User name.
Type the Password for that user name. (Six digits. * * * * * *)
H1 Perform monthly test
Press ( ).
Press ( ). The c.i.e. buzzer sounds, all the dots in the display are
shown and all LEDs on the front are turned on. If the c.i.e. has a
printer it has made a print out: ABC..........Z abc.........z.
Press ( ). Up to four zones can be set in test mode. Use the keypad
to type the zone numbers.
Press ( ). Perform the test. To end the test, press ( ).
If the routing equipment shall not be tested press ( ) and see
below.
If the routing equipment shall be tested press (  ) to highlight
Yes
and press ( ). Started test is indicated by LED "Fault tx
activated" and after 30 seconds also LED "Fire brigade tx". After 60
seconds (in total) the routing equipment test is ended and the LEDs
are turned off.
Press ( ).
Monthly test is completed. Press ( ).
To leave a menu press ESC.
To leave the menu system press the Soft key "Escape menu".
EBL512 G3 version 2.0.x, Daily user's manual
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents