1:2.1.2 Requirements

The installation personnel must have a basic knowledge in
handling electric equipment. The commissioning and
maintenance personnel must be well experienced in using
this kind of equipment.

1:2.2 Chapters included

• Introduction introduces the reader to this manual.
• Quickstart contains information on how to, in the quickest
way, install the softstarter and put it into operation. This
chapter is intended for the experienced user.
• Description describes the softstarter in general, its func-
tions and specifications.
• Mounting contains information on receiving, unpacking
and mounting the softstarter.
• Connection contains instructions on how to make the
electrical connections as well as connections for commu-
nication devices.
• Human-Machine Interface describes the local Human-
Machine Interface, how it works, and what it contains.
• Settings and configuration describes all possible settings
and how to navigate in the menu system.
• Fieldbus communication describes how to install and set
up the fieldbus communication.
• Maintenance describes what maintenance is needed.
• Functions describes all functions included in the soft-
starter, as well as the available minimum and maximum
values and default values used.
• Trouble shooting contains instructions on how to quickly
find and correct the most common faults.
• Diagrams contain a number of electrical diagrams for the
softstarter itself, and also some typical application dia-
grams.

1:2.3 Revision notes

Please check home page
www.abb.com/lowvoltage
for latest information on revisions.