Setting Current, Second Sequence; Start Ramp, Third Sequence; Initial Voltage, Third Sequence - ABB PST30 Installation And Commissioning Manual

Softstarters
Hide thumbs Also See for PST30:
Table of Contents

Advertisement

Chapter 10
Functions
170

10:73 Setting current, second sequence

Path in menu:
Menu/SETTINGS/Functional Settings/
Seq Start/2nd Seq. Param./2nd Set Ie
This parameter makes it possible to set the rated motor
current for the second parameter set.
Parameter
Default value Setting range
text
2nd Set Ie
Ir

10:74 Start ramp, third sequence

Path in menu:
Menu/SETTINGS/Functional Settings/
Seq Start/3rd Seq. Param./Start Ramp3
This parameter makes it possible to set the start ramp time
for the third parameter set.
Parameter
Default value
text
Start
10 s
Ramp3

10:75 Initial voltage, third sequence

Path in menu:
Menu/SETTINGS/Functional Settings/
Seq Start/3rd Seq. Param./Init Volt3
This parameter makes it possible to set the initial voltage for
the third parameter set.
Parameter
Default value Setting range
text
Init Volt3
30%
Description
9...1207A divided
Second
into 19 overlap-
sequence, motor
ping ranges
rated current
Setting range
Description
1...30s, 1...120s
Third sequence,
time for start
ramp
Description
30...70%
Third sequence,
initial voltage for
start ramp
1SFC132003M0201

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents