Bay control REC670 2.1 IEC
Commissioning manual
Commissioning and maintenance of the fault clearing system
Test instructions for protection IEDs to be tested
Test records from previous commissioning and maintenance tests
List of valid settings
Blank test records to fill in measured values

Recording

It is of utmost importance to carefully record the test results. Special test sheets
covering the frequency of test, date of test and achieved test values should be used.
IED setting list and protocols from previous tests should be available and all results
should be compared for differences. At component failures, spare equipment is used
and set to the requested value. A note of the exchange is made and the new measured
values are recorded. Test records for several years of testing should be stored in a
common file for a station, or a part of a station, to give a simple overview of the period
of testing and achieved test values. These test records are valuable when analysis of
service disturbances shall be done.

Secondary injection

The periodic maintenance test is done by secondary injection from a portable test set.
Each protection shall be tested according to the secondary injection test information
for the specific protection IED. Only the setting values adopted shall be checked for
each protection function. If the discrepancy between obtained value and requested set
value is too big the setting should be adjusted, the new value recorded and a note
should be made in the test record.

Alarm test

When inserting the test handle the alarm and event signalling is normally blocked.
This is done in the IED by setting the event reporting to Off during the test. This can
be done when the test handle is inserted or the IED is set to test mode from the local
HMI. At the end of the secondary injection test it should be checked that the event and
alarm signalling is correct by activating the events and performing some selected tests.

Self supervision check

Once secondary testing has been completed, it should be checked that no self-
supervision signals are activated continuously or sporadically. Especially check the
time synchronization system, GPS or other, and communication signals, both station
communication and remote communication.

Trip circuit check

When the protection IED undergoes an operational check, a tripping pulse is normally
obtained on one or more of the output contacts and preferably on the test switch. The
healthy circuit is of utmost importance for the protection operation. If the circuit is not
provided with a continuous trip-circuit supervision, it is possible to check that circuit
Section 12