Figure 2-6 Grounding And Lightning Protection Inside High Building - Motorola PTP 250 User Manual

Hide thumbs Also See for Motorola PTP 250:
Table of Contents

Advertisement

Grounding and lightning protection
Protection inside a high rise building
The following protection requirements must be observed inside multi-story or high rise
buildings
(Figure
The drop cable shield must be bonded to the building grounding system at the entry
point to the building.
The drop cable shield must be bonded to the building grounding system at the entry
point to the equipment area.
An LPU must be installed within 600 mm (24 in) of the entry point to the equipment
area.

Figure 2-6 Grounding and lightning protection inside high building

2-22
2-6):
UNDER DEVELOPMENT
Chapter 2: Planning considerations
phn-2182_003v004 (Oct 2011)

Advertisement

Table of Contents
loading

Table of Contents