ABB AC500 Introduction Manual page 111

Scalable plc for individual automation
Table of Contents

Advertisement

Repeat this procedure to append the modules DC532 and AX522. Then, the list of configured modules
looks as follows:
Proceed as follows to configure the module parameters. Click on "Configuration -> Parameters". Select
the corresponding module from the list.
Click on the corresponding module.
____________________________________________________________________________________________________________
G1
Introduction to AC500
1-109
AC500 / Issued: 07.2006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents