Storage - Husqvarna DXR250 Operator's Manual

Demolition robots
Hide thumbs Also See for DXR250:
Table of Contents

Advertisement

Shut off the machine.
Mount the wedge from the right with the stop notch
upwards/forwards.
Insert the wedge until it's fixated.
Insert the locking pin into the innermost possible hole.
Connect the hydraulic hoses and any hoses for
hammer lubrication (when fitting the hammer). Viewed
from the rear, the tool's return hose must first be
connected to the right side (A port) and then the
delivery hose to the left side (B port).
The hydraulic hoses are equipped with quick
couplings with decompression. This facilitates fitting
the hoses even though pressure is trapped.
To dismantle, follow the instructions in the reverse
order.

Storage

Store the tools safely and inaccessible to unauthorised
people. Ensure that they are in a stable position and
cannot tip over. If tools are placed high up or on a slope
they must be secured so that they cannot be put into
motion or fall. Protect the tools' hydraulic couplings
against dirt and damage.
TOOLS
English
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxr270Dxr310Dxr300Dxr140

Table of Contents