Installation Checklist; Checklist - ABB ACS800-U4 Hardware Manual

Drive modules
Hide thumbs Also See for ACS800-U4:
Table of Contents

Advertisement

Installation checklist

Checklist

Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person. Read the
instructions
Check
MECHANICAL INSTALLATION
The ambient operating conditions are allowed. (See
IEC data
or
NEMA
The unit is fixed properly into the cabinet. (See
Mechanical
installation.)
The cooling air will flow freely.
The motor and the driven equipment are ready for start. (See
installation:
Motor selection and
ELECTRICAL INSTALLATION (See
Drive does not include the EMC filter option (+E202, +E200) or the +E202 and +E200 EMC
filter capacitors are disconnected if the drive is connected to an IT (ungrounded) system.
The capacitors are reformed if stored over one year (refer to ACS600/800 Capacitor
Reforming Guide [3AFE64059629 (English)].
The drive is grounded properly.
The mains (input power) voltage matches the drive nominal input voltage.
The mains (input power) connections at U1, V1 and W1 and their tightening torques are OK.
Appropriate mains (input power) fuses and disconnector are installed.
The motor connections at U2, V2 and W2 and their tightening torques are OK.
The motor cable is routed away from other cables.
There are no power factor compensation capacitors in the motor cable.
The external control connections inside the drive are OK.
There are no tools, foreign objects or dust from drilling inside the drive.
Mains (input power) voltage cannot be applied to the output of the drive (with bypass
connection).
Motor connection box and other covers are in place.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
on the first pages of this manual before you work on the unit.
data,
Ambient
conditions.)
compatibility,
Planning the electrical
Mechanical
installation,
Planning the cabinet assembly
Planning the electrical
Technical
data:
Motor
installation,
Electrical
Safety
Technical
data:
and
connection.)
installation.)
Installation checklist
83

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-04Acs800

Table of Contents