1.10 Performing a Power-On Check

This section describes the procedure for performing a power-on check on a RRU3931E.
Context
Figure 1-39
Figure 1-39 Power-on check
Issue Draft A (2016-03-30)
Item
None of power cables and PGND cables are short-circuited, reversely
connected, damaged, or broken.
Power cables and PGND cables are separately bound from other cables.
All modules are connected using equipotential cables and then connected to
the closest ground bar by using PGND cables.
The connectors of each signal cable are intact and securely linked, and these
cables are not damaged or broken.
Labels are correct, legible, and complete at both ends of each cable.
shows the RRU3931E power-on check procedure.