Chapter 2 Preparations
1. Installing Internal Optional Devices
8. Install the tray onto the outer rails in the rack shelf.
9. Push the tray till it stops midway.
10. Secure the server on the tray.
a. Press the blue latch on each side of the rails to fully extend the server tray.
167
Express5800/T120h User's Guide