Programming
Ventilation in tunnel sections 1, 2 and 3:
FB12 switches the speed and direction of rotation of the fans according to the status of the
air pollution level (FB13) in the tunnel sections.
Figure 3-2
Flow diagram for fan control in FB10
38
S7-1500R/H redundant system
Getting Started, 10/2018, A5E44910930-AA