Section 2
Relay engineering process
2.3
20

Workflow

Save the work
between the
different steps
DNP3
IEC 60870-5
103
-
Modbus
CMT
Signal engineering
ACT
GUID-D133E703-E669-40F3-86EE-828FEFAA7EE5 V1 EN
Figure 3:
Protection relay engineering workflow proposal based on practical
experience and dependencies of the steps
It is possible to follow a different sequence based on the information available at the
start of the project. This means that several iterations may be needed to complete the
project.
PCM600 project setup
The plant structure is built according to the substation structure.
To add a protection relay to a project, a suitable connectivity package is needed.
Protection relays can be added either while connected or disconnected or through
other means such as an IED template.
IED objects are uniquely named within the PCM600 project.
Start
Create plant structure and
insert IED objects
Project
ACT
Configure IED functionality
SMT
Parametrization
PST
Configure pages for local HMI
GDE
IEC 61850
Export SCL files
Export
from PCM 600
SCD
I mport SCL files to
IET 600 and do
signal engineering
IET600
Export updated
SCL files from IET 600
Import
Import SCL files
SCD
to PCM
Make GOOSE connections
SMT
IED
Write configuration to IED
WRITE
End