Run Settings
After each item in the checklist has a green check (see Figure 5-12), the run settings can be verified. Touch the following fields to
configure the following:
Drain: This field configures the instrument drain settings following assay completion.
Set to Drain if the instrument will automatically drain liquid from the Pettes at the end of testing.

FIGURE 5-13. Pre-run Checklist Run Settings

Press the Start Run button to lock the AP3600 instrument doors and begin the automated run process.
Note: To cancel the test at this time, press the Unload Racks button to move the racks back to the load/unload position for removal
from the instrument.
5-8