Configuring And Operating The SIMATIC
Field PG P4
What Does This Chapter Contain?
The chapter below describes all tasks required to successfully set up your
workplace. These include:
• initial steps for commissioning your SIMATIC Field PG P4,
• working with battery operation and replacing the battery,
• connecting peripheral devices,
• working with memory submodules for the PLC and
• connecting your PG to other devices.
Chapter Overview
Section
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
Warning
!
When connecting long signal lines (especially for plant-wide connections), make
sure that the signal lines are connected to the local equipotential grounding system
(cable shield connected to protective conductor).
SIMATIC Field PG P4 Manual
A5E00180080-04
Description
Unpacking and Setting Up the SIMATIC Field PG P4
Connection to the Power Supply
Battery Operation
Commissioning
Panel "Field PG"
Connecting Peripheral Devices
Working with SIMATIC-S5 memory submodules
Working with SIMATIC Memory Cards
Working with Micro Memory Cards
Working with PC Cards
Connecting the Field PG P4 to a SIMATIC S5 Network
Connecting the Field PG P4 to a SIMATIC S7 Network (MPI/
DP)
Networking the Field PG P4 with Other Stations on PROFI-
BUS
Ethernet (RJ45 Ethernet Interface)
3
Page
3-2
3-4
3-5
3-8
3-11
3-12
3-16
3-17
3-18
3-19
3-20
3-21
3-23
3-24
3-1