Configuring And Operating The Simatic Field Pg P4 - Siemens SIMATIC Field PG P4 Manual

Table of Contents

Advertisement

Configuring And Operating The SIMATIC
Field PG P4
What Does This Chapter Contain?
The chapter below describes all tasks required to successfully set up your
workplace. These include:
• initial steps for commissioning your SIMATIC Field PG P4,
• working with battery operation and replacing the battery,
• connecting peripheral devices,
• working with memory submodules for the PLC and
• connecting your PG to other devices.
Chapter Overview
Section
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
Warning
!
When connecting long signal lines (especially for plant-wide connections), make
sure that the signal lines are connected to the local equipotential grounding system
(cable shield connected to protective conductor).
SIMATIC Field PG P4 Manual
A5E00180080-04
Description
Unpacking and Setting Up the SIMATIC Field PG P4
Connection to the Power Supply
Battery Operation
Commissioning
Panel "Field PG"
Connecting Peripheral Devices
Working with SIMATIC-S5 memory submodules
Working with SIMATIC Memory Cards
Working with Micro Memory Cards
Working with PC Cards
Connecting the Field PG P4 to a SIMATIC S5 Network
Connecting the Field PG P4 to a SIMATIC S7 Network (MPI/
DP)
Networking the Field PG P4 with Other Stations on PROFI-
BUS
Ethernet (RJ45 Ethernet Interface)
3
Page
3-2
3-4
3-5
3-8
3-11
3-12
3-16
3-17
3-18
3-19
3-20
3-21
3-23
3-24
3-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents