Toro 07161 Installation Instructions Manual page 9

Ball cage kit workman gtx utility vehicle
Table of Contents

Advertisement

Figure 17
Marking the rear floor channel
1. Front of the machine
2. Forward floor channel
3. Floor brace
4.
Remove the floor brace from the machine.
5.
Centerpunch the 10 marks that you made in
step
3
of
Drilling the Frame Channels (page
Figure 18
1. Rear floor channel
2. 8 mm (5/16 inch) drill bit
3. Side frame channel
g237472
4. Side frame channel (left)
5. Rear floor channel
6. Side frame channel (right)
8).
g237469
4. Forward floor channel
5. Front of the machine
6.
Drill the side and floor channels at the
centerpunch marks with a 8 mm (5/16 inch) drill
bit
(Figure
18).
7.
Repeat steps
1
the other side of the machine.
Assembling the Floor Braces to
the Machine
1.
Align the holes in the floor brace with the holes
that you drilled in the side and floor channels
(Figure
19).
1. Floor brace
2. Rear floor channel
3. Front of the machine
4. Flange locknut (5/16 inch)
2.
Assemble the floor brace to the side and floor
channels with 10 flange-head bolts (5/16 x 1
inch) and 10 flange locknuts (5/16 inch) as
shown in
Figure
3.
Torque the flange-head bolts and flange locknuts
to 19.8 to 25.4 N∙m (175 to 225 in-lb).
4.
Repeat steps
1
the other side of the machine.
9
through
6
for the floor brace at
Figure 19
5. Flange-head bolts (5/16 x
1 inch)
6. Forward floor channel
7. Side frame channel
19.
through
3
for the floor brace at
g237470

Advertisement

Table of Contents
loading

Table of Contents