Installation Procedure; Preparation For Installation - NEC PASOLINK Training Course

Digital microwave radio system
Table of Contents

Advertisement

NEC
Preparation work is that work done before going to install any site.
That work include the following steps:
Packing list check
Equipment and
Materials Sorting
Equipment and
materials delivery to
site
Notes:
1- The preparation work can be done for site by site or for all sites depending on company schedule
And resources.
2- The next page include a detailed list of the equipment and materials to be sorted for each site.
January 2002
Preparation work
During the packing list check, we shall determine which
case include which items (materials)
Sorting means assignment of equipment and materials
to each site.
The delivery to site should be by safe way, by care
persons, and up to shelter or top of the building.
PASOLINK installation procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents