Download Print this page

Toro 2226 Software Manual page 13

Directional drill
Hide thumbs Also See for 2226:

Advertisement

Manual Pipe Loading
Manual pipe loading mode allows the operators to load and unload pipes from the cam assembly when it is
rotated outside the pipe box.
Note:
Use 2 people to load the pipes into the cam assembly.
1.
Set the machine to manual pipe loading mode; refer to
2.
Use buttons 2 and 3 to choose where you want the pipe to be placed; a row or the drill string
3.
Raise the elevator
4.
Push the cam rotate dial
5.
Raise the pipe loading guard
(Figure
42).
to rotate the cam assembly outside of the pipe box
UP
(Figure
42).
Figure 40
Carriage Settings Screen (page
Figure 41
13
g238408
17)..
(Figure
41).
g238311
(Figure
42).

Advertisement

loading

This manual is also suitable for:

23803