Detailed description
2.3 Coordinate systems
Figure 2-19
The following settings apply:
• The user can change the basic offset from the part program by means of an operator
• If the basic offset is to take effect immediately, an ASUB can be started via the PLC using
Note
Recommendation to the machine manufacturer
Use the 3rd basic offset onwards for your own applications.
The 1st and 2nd basic offset are reserved for PRESET and the "Zero offset external".
48
Example of the use of the basic offset
action and from the PLC.
FC9 in order to execute the appropriate G code.
Basic logic functions: Axes, coordinate systems, frames (K2)
Function Manual, 11/2006, 6FC5397-0BP10-2BA0