ABB Relion 670 Series Product Manual page 150

Bay control
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Bay control REC670
Version 2.2
Binary input/
Ordering no
output module and
mA input module
For pulse counting, for example kWh metering, the BIM with enhanced pulse counting capabilities must be used.
Note: 1 BIM required in position P3 and 1 BOM required in position P4. Products B30 and C30 require an extra BIM in position P5.
IOM 8 inputs, RL
1MRK000173-CF
220-250 VDC,
110mA, 10+2
output relays
IOM with MOV 8
1MRK000173-GC
inputs, RL 24-30
VDC, 50mA, 10+2
output relays
IOM with MOV 8
1MRK000173-AD
inputs, RL 48-60
VDC, 50mA, 10+2
output relays
IOM with MOV 8
1MRK000173-BD
inputs, RL 110-125
VDC, 50mA, 10+2
output relays
IOM with MOV 8
1MRK000173-CD
inputs, RL 220-250
VDC, 50mA, 10+2
output relays
mA input module
1MRK000284-AB
MIM 6 channels
SOM static output
1MRK002614-CA
module, 6 heavy
duty static
outputs, 250 VDC
+ 6 output relays
Selection for
position #10
1)
These black marks indicate the maximum number of modules per casing type and the slots that can be occupied.
2)
Maximum 4 (BOM+SOM+MIM) boards. P5 not in B30/C30.
3)
P5 not in B30/C30
4)
Maximum 1 MIM in 1/2 case
5)
P5 not in B30/C30
6)
SOM must not to be placed in the position nearest to NUM: 1/2 case slot P5, 3/4 case 1 TRM slot P10, 3/4 case 2 TRM slot P7, 1/1 case 2 TRM slot P13, 1/1 case, 1 TRM slot
P16.
7)
P5 not in B30/C30
150
P2
P2
P2
U
U
U
V
V
V
W
W
W
Y
Y
Y
R
R
R
T2
T2
T2
C
© Copyright 2017 Hitachi Power Grids. All rights reserved
#10
P2
P2
P2
P2
P2
P2
U
U
U
U
U
U
V
V
V
V
V
V
W
W
W
W
W
W
Y
Y
Y
Y
Y
Y
R
R
R
R
R
R
T2
T2
T2
T2
T2
T2
1MRK 511 404-BEN N
Notes and rules
P2
P2
P2
U
U
U
V
V
V
W
W
W
Y
Y
Y
R
R
R
4)
5)
,
T2
T2
6)
7)
,
Hitachi Power Grids

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents