Testing (With Load) - ABB PQFS Installation, Operation And Maintenance Instructions

Power quality filter
Table of Contents

Advertisement

LV Active Filters PQF
Commissioning report
Configure programmable alarms if applicable
For full redundancy, configure programmable alarms on all masters of a multi-master
(g)
system
Remarks:
(a)
Refer to
Sections
8.5.
(b)
Navigate with the PQF-Manager to [/Welcome/Settings/Commissioning].
(c)
Encircle the correct setting. Negative values imply inversed CT orientation or cabling.
(d)
Navigate with the PQF-Manager to [/Welcome/Settings/Customer set./Digital inputs].
(e)
Navigate with the PQF-Manager to [/Welcome/Settings/Customer set./Digital outputs].
(f)
Navigate with the PQF-Manager to [/Welcome/Settings/Customer set./Warnings].
(g)
Navigate with the PQF-Manager to [/Welcome/Settings/Customer set./Alarms].

8.11.4 Testing (with load)

Before starting the filter
Deselect all harmonics and reactive power/balancing
(b)
Start the filter
While the filter is running(c)
If harmonic load is present, select for example the 11
Check the line current (Irms, 11
If harmonic load is not present, generate static capacitive power (first select H3)
Check the filter currents (fundamental current level)
Set up the user requirements for harmonics and reactive power/balancing
Check the line currents (Irms, THDI and waveforms)
Check the line voltage (Vrms, THDV and waveforms)
Remarks:
(a)
Refer to
Section 8.7
(b)
Refer to
Section 8.8
(c)
Refer to
Section 8.9
(d)
Refer to
Section 8.10
Project:
Issued by:
Date:
(g)
and
8.6
of the manual for more information on this topic.
th
harmonic level and waveforms)
of the manual for more information on this topic.
of the manual for more information on this topic.
of the manual for more information on this topic.
of the manual for more information on this topic.
(a)
th
harmonic
Manual Power Quality Filter PQFS  Commissioning instructions 163
Page 4 of 7
OK/NOK
(d)