Installation Procedure; Table 9 List Of Ups Weights; Figure 33 Clearance For Ventilation And Maintenance - Mitsubishi Electric 1100B Series Owner Technical Manual

Table of Contents

Advertisement

3.4 INSTALLATION PROCEDURE

A) Note the load tolerance of the floor
Refer to Table 9 for list of UPS weights.

Table 9 List of UPS Weights

!
UPS Capacity (kVA)
Weight (lb.)
NOTE
B) Minimum clearance required for ventilation:
Right side
Left side
Back side
Top side
C) Space requirement for routine maintenance:
Allow for the following space at the time of installation.
Front
Sides
Rear
Top side

Figure 33 Clearance for Ventilation and Maintenance

31.5" (800mm)
For Maintenance
1100B SERIES UPS
OWNERS / TECHNICAL MANUAL
10
20
499
543
1.0" (25 mm) (not required when sidecars are used)
1.0" (25 mm) (not required when sidecars are used)
8.0" (203 mm)
16.0" (406 mm)
31.5" (800 mm)
1.0" (25 mm)
8.0" (203 mm)
16.0" (406 mm)
16" (406mm)
For Air exhaust
and Maintenance
Side View
MITSUBISHI ELECTRIC 1100B SERIES UPS
Page Number:
30
40
50
587
631
675
8" (203mm)
For Air exhaust
3-4
60
70
80
719
763
807

Advertisement

Table of Contents
loading

Table of Contents