GE LOGIQ E9 Service Manual page 384

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-5-4
Top Cover replacement
Manpower /
Time
One person /
15 minutes
Table 8-11
1. Power down the system.
2. Disconnect the mains power cable from the wall outlet and all Probes and External I/O Cabling.
3. Remove Side Covers.
Preparation Links (if you need more information):
• 4-2-3 "Power shut down" on page 4-7.
• 8-5-2 "Side Covers replacement" on page 8-30.
8-5-4-1
Top Cover removal
1.. Remove the two screws that secure the Top
Cover.
Remove the Top Cover and gently pull back
and up.
Reinstalled to the screws to avoid damage
to the Rear Handle.
8 - 38
. 2
EV
Table 8-10
Manpower / Time and Tools
Refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page
Preparations and Preparation Links
Preparations - you must perform the following steps
Table 8-12
Top Cover removal
(Top Cover Screw placement as seen from above.)
Steps
Section 8-5 - Replacing Covers and Bumpers
LOGIQ E9 S
Tools
Corresponding Graphic
M
ERVICE
ANUAL
8-5.

Advertisement

Table of Contents
loading

Table of Contents