GE LOGIQ E9 Service Manual page 593

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-10-2-2
Main PS installation
NOTE:
If the 4D MC option was installed, make sure to reinstall the option into the new replacement
PS.
Table 8-159 Main PS installation
1.
Make sure the GFI PCIe cable is routed
behind the Main PS fang. GFI
Configuration only. MRX does not use this
cable.
Slide the Main PS (1) forward to seat the
connectors (2) on the Card Cage.
Engage the tab onto the Fang, from where
it was removed.
Install the three screws (3) that secure the
Main PS using a 5 mm Allen wrench
(Torque: 10 Nm {7.4 lbf-ft}).
. 2
EV
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
ERVICE
Corresponding Graphic
M
ANUAL
8 - 247

Advertisement

Table of Contents
loading

Table of Contents