GE LOGIQ E9 Service Manual page 423

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-5-19
Main Cable Cover replacement
8-5-19-1
Manpower
One person, 15 minutes.
8-5-19-2
Tools
For tools needed, refer to:
8-5-19-3
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the system
2.) Disconnect the mains power cable from the wall outlet.
3.) Disconnect all Probes and External I/O Cabling.
4.) Remove the Side Covers.
5.) Remove the Top Cover.
6.) Remove the four screws to the Column Cover Assembly.
Follow these links if you need more information:
4-2-3 "Power shut down" on page 4-7.
8-5-2 "Side Covers replacement" on page 8-30.
8-5-4 "Top Cover replacement" on page 8-38.
8-5-18 "Column Cover Assembly replacement" on page 8-73.
8-5-19-4
Main Cable Cover removal
1.) Remove the Main Cable Cover.
Figure 8-33 Main Cable Cover (Column Cover overlaps Main Cable Cover)
. 2
EV
8-2-5 "Tools needed for servicing the LOGIQ E9" on page
Chapter 8 Replacement procedures
LOGIQ E9 S
M
ERVICE
ANUAL
8-5.
8 - 77

Advertisement

Table of Contents
loading

Table of Contents