Installation Sequence
Subcategory
Concrete Podium Installation
Solution
Removing the Transport Protection
Cover
Securing Pre-fab. Modules
Obtaining the Emergent Backup Key Obtaining the Emergent Backup Key
Installing and Combining Pre-
fab. Modules
Disabling the Door Closer
Installing External Sealing Materials
for Combined Pre-fab. Modules
Installing Internal Sealing Materials
for Combined Pre-fab. Modules
Grounding Pre-fab. Modules
Checklist of Devices Installed Onsite
Item
Determining the Pre-fab. Module Installation
Position
Removing the Transport Protection Cover
Removing the Side Panels for
Combining with the Next
Pre-fab. Module
Installing Supportive Columns
Installing Distance Blocks for
Combining with the Next
Pre-fab. Module
Hoisting and Securing Pre-fab. Modules (Mounting
Base Solution)
Hoisting a Pre-fab. Module (Concrete Podium
Solution)
Removing Supportive Columns
Securing Pre-fab. Modules (Concrete Podium
Solution)
Disabling the Door Closer
Installing External Sealing Rubber Strips
Installing Waterproof Rolls
Installing Rubber Strip Clamping Plates
Installing Corner Fitting Covers
Installing Rubber-Plastic Thermal Insulation Panels
Installing Rubber Panels
Installing Tread Plates Between Combined Pre-fab.
Modules
Installing Thermal Insulation Foam
Installing Aluminum Composite Panels
Grounding Pre-fab. Modules
Corresponding Chapter in Installation Guide
Determining the Pre-fab. Module Installation
Position
Removing the Transport Protection Cover
Removing Side Panels for Combining Pre-fab.
Modules
Installing Supportive Columns
Hoisting and Securing Pre-fab. Modules
Hoisting and Securing Pre-fab. Modules
Hoisting and Securing Pre-fab. Modules
Removing Supportive Columns
Hoisting and Securing Pre-fab. Modules
-
-
Installing External Sealing Rubber Strips
Installing Waterproof Rolls and Rubber Strip
Clamping Plates
Installing Waterproof Rolls and Rubber Strip
Clamping Plates
Installing Corner Fitting Covers
Install Bottom Sealing Materials
Install Bottom Sealing Materials
Install Bottom Sealing Materials
Installing Top and End Sealing Materials
Installing Top and End Sealing Materials
Grounding Pre-fab. Modules
Diagram ID
Diagram Name
NO.S003
Concrete Podium Position Diagram
-
N/A
NO.S004
Pre-fab. Module Combination Diagram
Pre-fab. Module Securing Position
NO.S005
Diagram
-
N/A
-
N/A
External Sealing Material Installation
NO.S006
Position Diagram
Installation Position Diagram for
NO.S007
Internal Pre-fab. Module Combination
Materials
Pre-fab. Module Grounding Position
NO.S008
Diagram