Step 12 Move the smart cooling product.
Steel plates and pipes must be placed a certain distance away from the pre-fab.
module side wall to prevent scratching the side wall.
1.
2.
3.
Issue 01 (2021-04-20)
NO TICE
– Cut a pipe inside the smart cooling product about 20 mm away from a
turning point in the vertical direction.
– Cut a pipe outside the smart cooling product about 40 mm away from the
bottom of the smart cooling product on the vertical direction.
Figure 4-15 Cutting pipes
(1) Cutting points on smart cooling product pipes
NO TICE
Take the fittings for moving the smart cooling product from the pre-fab.
module fitting bag.
NO TE
The fittings required for moving the smart cooling product include one 3 mm thick
steel plate and five 0.5 m long DN32 steel pipes.
Place the 3 mm thick steel plate on the raised floor in the cold aisle.
Place two 0.5 m long steel pipes on the steel plate.