Figure 1-2 Ptc Console Indicator And Controls Locations - Siemens A80672 Installation & Operation Manual

Ptc console
Table of Contents

Advertisement

_______________________________________________________________________________________________________________

Figure 1-2 PTC Console Indicator and Controls Locations

SIG-00-13-12
Version No.: B
WHEN INSTALLING THE POWER/ECD CONNECTOR AS SHOWN AT
LOCATION (2) IN FIGURE 1-2, ENSURE THE TWO SCREWS LOCATED ON
EITHER SIDE OF THE POWER CONNECTOR ARE SECURELY FASTENED,
TO PREVENT LOOSENING OF THE DEVICE.
ADDITIONALLY, DO NOT UNPLUG THE ECD WHEN ACTIVELY FLASHING
RED (SHOWN IN FIGURE 1-3). THIS INDICATES THAT DATA IS CURRENTLY
BEING WRITTEN TO THE DEVICE.
DISCONNECTING THE ECD DURING THIS OPERATION MAY CORRUPT
INTERNAL CONFIGURATION INFORMATION.
WAIT UNTIL THE LED TURNS GREEN BEFORE REMOVING THE ECD FROM
THE CONSOLE.
CAUTION
1-3
INTRODUCTION
February 2021

Advertisement

Table of Contents
loading

Table of Contents