● When a solar inverter is faulty, try to avoid standing in front of the solar
inverter.
● Do not operate the DC switch on the solar inverter before you finish
Step
● If the AC switch between the solar inverter and the power grid has
automatically disconnected, do not turn on the switch before the fault is
rectified.
● Before power-off for troubleshooting, do not touch the energized components
of the solar inverter. Otherwise, electric shocks or arcing may occur.
Procedure
Step 1 Wear proper personal protective equipment (PPE).
Step 2 If the solar inverter is not shut down due to a fault, send a shutdown command
on the SUN2000 app, SmartLogger, or management system. If the solar inverter
has shut down due to a fault, go to the next step.
Step 3 Turn off the AC switch between the solar inverter and the power grid.
Step 4 Measure the DC current of each PV input string using a clamp meter that is set to
the DC position.
Step 5 Open the maintenance compartment door, install a support bar, and use a
multimeter to measure the voltage between the AC terminal block and the
ground. Ensure that the AC side of the solar inverter is disconnected.
Step 6 Turn off all DC input switches of the solar inverter.
Figure 8-1 Power-off for maintenance
Issue 07 (2021-07-08)
CA UTION
5.
If the current is less than or equal to 0.5 A, go to the next step.
If the current is higher than 0.5 A, wait until the solar irradiance decreases
and the PV string current decreases below 0.5 A at night, and then go to the
next step.
Copyright © Huawei Technologies Co., Ltd.
8 Maintenance
Step 3
to
84

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

196ktl-h0200ktl-h2215ktl-h0Sun2000-196ktl-h0Sun2000-200ktl-h2Sun2000-215ktl-h0 ... Show all

Table of Contents