ABB AccessControl System Manual page 53

Table of Contents

Advertisement

Fig. 43:
Inserting the batteries
4. Inserting the batteries of the "Electronic cylindrical lock".
click!
1
2
Fig. 44:
Mounting the head housing
5. Remount the head housing of the reading head.
Ensure that the contact protection remains within the head housing and does not buckle
during mounting.
Fig. 45:
Maintenance card
6. Log the reading head into the "Smart Access Point Pro" with the maintenance card.
To log in the reading head, change into the management software of the "Smart Access
Point Pro.
For the necessary steps in the management software, see chapter 5.2.2 "Creating
floors" on page 99.
The reading head is added to the list of available devices.
7. Placing the reading head in the building structure of the "Smart Access Point Pro".
To place the reading head, change into the management software of the "Smart Access
Point Pro.
For the necessary steps in the management software, see chapter 5.4.3 "Placing the
"Electronic cylindrical lock"" on page 120.
If the building structure is not yet available, first create it, see chapter 5.3.2 "Add
"Electronic cylindrical lock"" on page 105.
System Manual 2CKA001473B5074
LR1
Commissioning
│53

Advertisement

Table of Contents
loading

Table of Contents