Adding Larger Projects / Devices In Advance; Rf/Ip Gateway - ABB AccessControl System Manual

Table of Contents

Advertisement

3.2.2

Adding larger projects / devices in advance

Adding the "Electronic cylindrical lock" can become a time-consuming and bothersome matter
particularly for larger projects. Especially when the "Electronic cylindrical lock" are mounted
further removed from the "Smart Access Point Pro".
In such cases it is recommended to commission all devices ("Electronic cylindrical lock", "RF
Repeater", etc) directly on the "Smart Access Point Pro" before mounting, and to mount them
only later at their area of application. Create for this an appropriate plan.
One thing needs to be observed for this procedure. During commissioning of the "Electronic
cylindrical lock" the entire communication path between the reading head and the "Smart
Access Point Pro" is stored in the management software. If the "Electronic cylindrical lock", with
the additional devices that may be required, is later mounted at the area of application, this
communication path must match. If it does not, the respective "Electronic cylindrical lock" is
displayed as not recognized and must be commissioned again.
This also applies if a "Electronic cylindrical lock" is mounted at a different area of application at
a later point in time.
Notice
This slightly more complex commissioning takes place against the background
that the entire device control is carried out outside of the battery-operated
access devices. This reduces the energy consumption of the reading heads and
increases the service life of the batteries.
3.2.3

"RF/IP Gateway"

The following points are a prerequisite for commissioning the "RF/IP Gateway".
The "RF/IP Gateway" is connected to the network.
The power supply of the "RF/IP Gateway" is established.
Via PoE or via a separate 24 V power supply.
The serial number of the "RF/IP Gateway". This is located on the device.
The "Smart Access Point Pro" is ready for operation. This must be the "Smart Access Point
Pro" that is used in the system.
„Smart Access Point Pro":
A PC is connected with the "Smart Access Point Pro".
The management software of the "Smart Access Point Pro" is opened on the PC.
If the commissioning process has been prepared, the "RF/IP Gateway" is added in the
management software of the "Smart Access Point Pro".
Use the following points for commissioning the "RF/IP Gateway":
1. Add the "RF/IP Gateway" in the "Smart Access Point Pro".
To add, change into the management software of the "Smart Access Point Pro".
For the necessary steps in the management software, see chapter 5.3.4 "Add "RF/IP
Gateway"" on page 108
System Manual 2CKA001473B5074
Commissioning
│55

Advertisement

Table of Contents
loading

Table of Contents