8.1 Starting a Parallel System

Prerequisites
● Before starting a parallel system, ensure that each UPS has been commissioned
● Choose Monitoring > UPS System > Running Parameter > System Settings
● If you commission the parallel system where UPSs are not powered off after
● Ensure that all load circuit breakers in the system are OFF. Do not start loads
● Before connecting parallel cables, if you turn on the external output switch of
Procedure
Step 1 Check before power-on: Ensure that the mains input, bypass input, and AC output
cables of each UPS in the parallel system are connected in the same phase
sequence.
1.
2.
3.
Issue 02 (2021-04-22)
8

Parallel System Commissioning

CA UTION
(see
7.1 Powering On and Starting the
on the WebUI of each UPS and set EPO detection to Enable.
they are commissioned individually, skip step 4. In addition, ensure that step 1
is performed before commissioning a single UPS.
before the parallel system is started.
the rack by mistake, the system may report alarm 0570-002 BPM unit
abnormal. In this case, you need to power off the rack to clear the alarm.
Check that the general input and output switches are OFF.
Check that power cables to all UPSs are connected in parallel.
Use a multimeter to measure the impedance between phases A, B, and C of
the mains/bypass input and AC output of any UPS. If the measured result is
low conducted resistance, check whether the cables to each UPS are short-
circuited.
Copyright © Huawei Technologies Co., Ltd.
8 Parallel System Commissioning
UPS).
129

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-h-800kva

Table of Contents