Yamaha MT-09 2021 Service Manual page 83

Table of Contents

Advertisement

1. Throttle body
2. Yellow paint mark
3. White paint mark
4. Cylinder head breather hose
5. Canister purge hose (purge cut valve sole-
noid to hose joint)
6. Hose clamp
A. Face the bolt head to the position as shown
in the figure.
B. 123°
C. 105°
D. 10°
E. Hose until it butts against the purge cut valve
solenoid.
F. The end of the clip should face the upward.
G. Hose until it butts against the throttle body
joint.
H. The end of the clip should face the forward.
I.
The end of the clip should face the left.
J. The end of the clip should face the right.
K. Hose until it butts against the throttle body.
L. 5–7 mm (0.20–0.28 in) (3 places)
M. Insert the cylinder head breather hose until it
reaches the rounded end of the pipe. Install
the cylinder head breather hose with the yel-
low paint mark facing the left. Install the clip
with its end facing the left.
N. Insert the cylinder head breather hose until it
reaches the rounded end of the pipe. Install
the cylinder head breather hose with the
white paint mark facing the right. Install the
clip with its end facing the right.
O. 1–3 mm (0.04–0.12 in)
2-56
CABLE ROUTING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mt-09sp 2021

Table of Contents