ABB Relion 650 Series Engineering Manual
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Quick Links

®
Relion
650 SERIES
650 series
Version 1.1 ANSI
Engineering manual

Advertisement

Table of Contents
loading

Summary of Contents for ABB Relion 650 Series

  • Page 1 ® Relion 650 SERIES 650 series Version 1.1 ANSI Engineering manual...
  • Page 3 Document ID: 1MRK 511 245-UUS Issued: November 2019 Revision: A Product version: 1.1 © Copyright 2011 ABB. All rights reserved...
  • Page 4 Copyright This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents thereof must not be imparted to a third party, nor used for any unauthorized purpose. The software or hardware described in this document is furnished under a license and may be used or disclosed only in accordance with the terms of such license.
  • Page 5 In case any errors are detected, the reader is kindly requested to notify the manufacturer. Other than under explicit contractual commitments, in no event shall ABB be responsible or liable for any loss or damage resulting from the use of this manual or the application of the equipment.
  • Page 6 Directive 2004/108/EC) and concerning electrical equipment for use within specified voltage limits (Low-voltage directive 2006/95/EC). This conformity is the result of tests conducted by ABB in accordance with the product standards EN 50263 and EN 60255-26 for the EMC directive, and with the product standards EN 60255-1 and EN 60255-27 for the low voltage directive.
  • Page 7: Table Of Contents

    Creating an application configuration with ACT................45 5.1.1 Overview............................45 5.1.2 Function blocks..........................46 5.1.3 Signals and signal management....................47 5.1.4 Function block execution parameters..................48 5.1.5 Configuration parameters......................50 5.1.6 Connections and variables......................50 5.1.7 Hardware channels......................... 51 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 8 Engineering in PCM600........................91 Section 9 DNP3 communication engineering..............93 Signal configuration user information..................93 Configuring DNP3 protocol signals....................93 Setting DNP3 signal parameters....................95 9.3.1 Configuring DNP3 class.........................96 Section 10 Glossary......................99 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 9: Introduction

    IEDs. The installation and commissioning personnel must have a basic knowledge of handling electronic equipment. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 10: Product Documentation

    IED should be commissioned. The operation manual contains instructions on how to operate the IED once it has been commissioned. The manual provides instructions for monitoring, controlling and setting the IED. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 11: Document Revision History

    1MRK 505 265-TUS Documents related to REL650 Identity number Application manual 1MRK 506 325-UUS Technical manual 1MRK 506 326-UUS Commissioning manual 1MRK 506 327-UUS Table continues on next page 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 12 Communication protocol manual, IEC 60870-5-103 1MRK 511 243-UUS Point list manual, DNP3 1MRK 511 244-UUS Engineering manual 1MRK 511 245-UUS Operation manual 1MRK 500 093-UUS Installation manual 1MRK 514 014-UUS 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 13: Symbols And Conventions

    • Dimensions are provided both in inches and mm. If it is not specifically mentioned then the dimension is in mm. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 14: Functions Included In 650 Series Ieds

    Sensitive directional residual overcurrent and power protection UC2PTUC Time-delayed two-step undercurrent protection LPTTR Thermal overload protection, one time constant TRPTTR Thermal overload protection, two time constants Table continues on next page 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 15 A1A2_DC Interlocking for bus-section disconnector ABC_BC Interlocking for bus-coupler bay BH_CONN Interlocking for 1 1/2 breaker diameter BH_LINE_A Interlocking for 1 1/2 breaker diameter Table continues on next page 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 16 TMAGGIO Trip matrix logic Configurable logic blocks, OR INVERTER Configurable logic blocks, Inverter PULSETIMER Configurable logic blocks, PULSETIMER GATE Configurable logic blocks, Controllable gate Table continues on next page 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 17 SSIMG Insulation gas-monitoring function SSIML Insulation liquid-monitoring function SSCBR Circuit breaker condition monitoring I103MEAS Measurands for IEC60870-5-103 I103MEASUSR Measurands user defined signals for IEC60870-5-103 Table continues on next page 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 18 GOOSE function block to receive a single point value Scheme communication ZCPSCH Scheme communication logic for distance or overcurrent protection ZCRWPSCH Current reversal and weak end infeed logic for distance protection Table continues on next page 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 19 Global base values for settings DOSFRNT Denial of service, frame rate control for front port DOSLAN1 Denial of service, frame rate control for LAN1 port DOSSCKT Denial of service, socket flow control 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 21: Engineering Tool Set

    61850 communication files for a bay IED or a complete station can be exported from PCM600 to station engineering tools for engineering of station communication between bay IEDs and station IEDs. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 22: Ied Engineering Process

    • Configuring connections between the application configuration function blocks and physical hardware input and outputs by using the Signal Matrix tool or the Application Configuration tool. • Communication engineering 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 23 IEC08000100.vsd IEC08000100 V1 EN-US Figure 3: Organization of PCM600 in different management tasks Additional functionality to manage the project and to organize the user rights: • PCM600 user management 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 24 IED for various purposes. The connection between the physical IED and PCM600 is established via an Ethernet link on the front or rear port on the IED. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 25: Engineering Process

    It is possible to do a different sequence based on the available information at the time the project is started. This means that several iterations may be needed to finish the project. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 26 The IED restarts automatically when writing an IED configuration where changes have been made to, for example configuration parameters. It is not possible to communicate with the IED during the restart. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 27: Setting Up A Project

    The communication between the IED and PCM600 is independent of the used communication protocol within the substation or to the NCC. The communication media is always Ethernet and the used protocol is TCP/IP. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 28 Tx with Rx on the other side and vice versa. These cables are known as null-modem cables or cross-wired cables. The maximum length should be about 2 m. The connector type is RJ-45. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 29 IP address automatically as described in the following procedure. Select Network Connections in the PC. IEC09000355-1-en.vsd IEC09000355 V1 EN-US Figure 6: Select: Network connections Select Properties in the status window. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 30 IEC09000357 V1 EN-US Figure 8: Select the TCP/IP protocol and open Properties DHCPServer is set to Enabled in Select Obtain an IP address automatically if the parameter the IED. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 31 Close all open windows and start PCM600. Setting up the PC to access the IED via a network This task depends on the used LAN/WAN network. PC and IED must belong to the same subnetwork. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 32: Project Managing In Pcm600

    Projects on my computer . Open New Project . To create new project currently open projects and object tools Click the icon shall be closed. New Project window opens, see Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 33: Building A Plant Structure

    Bay = Bay within the voltage level IED = selection of the IED, which is used in the bay. Several IEDs are possible within a bay, for example one control IED and two protection IEDs. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 34: Iec 61850 Naming Conventions To Identify An Ied

    A user oriented textual designation is contained in attribute desc. Attributes are not allowed to contain carriage return, line feed or tab characters. The semantics of desc shall also be relative within an object hierarchy. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 35 The bay level has been renamed as "Q1" • The IED has been renamed as "SB1" The renamed full path name of the technical key for the IED would be DMSTATC1Q1SB1. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 36: Inserting An Ied

    IED. The offline configuration in PCM600 can be synchronized with the physical IED at a later state by connecting the IED to PCM600. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 37 Select the IED type to insert. It is also possible to drag-and-drop an IED from the Object Types window to the Bay level. Online Configuration mode, see Select the Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 38 Select the IED Communication protocol, see Figure IEC09000661-1-en.vsd IEC09000661 V1 EN-US Figure 16: PCM600: Communication protocol selection wizard Select the port and insert the IP address of the physical IED to configure, see Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 39 IP address is not correct. Scan option to scan/read the IED Type and IED Version for the IED that is online, see Click the Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 40 Figure 19: PCM600: IED housing and display type detection Setup Complete Page dialog shows the summary of the IED Type , IED Version , IP Address of IED and Order Number , 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 41 21. The order specific file is delivered in a order confirmation E-mail. If no order specific file is available then No Order Specific File option, see select the Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 42 An IED in the plant structure can be exported as a template (*.pcmt). The user can build up a template library with all the exported IED templates. It is possible to insert an IED from the 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 43 Click the icon in the right column of the list of available templates to open the Properties . Verify the template information, see Close to close the window. Figure 24 and click 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 44 Create an own configuration, export the configuration as *.pcmi file and use it to configure other IEDs. Procedure to insert a configured IED in 650 series Import ... to select the IED configuration file (*.pcmi) , see Right-click the bay and select Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 45: Setting Ied Ip Address In The Project

    IED to which the PC is connected. The IP address of the physical IEDs front and rear port can not be set from PCM600 but only from LHMI. • Via the first window of the wizard when including a new IED in a project, see Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 46 Open the IP address row and enter the IP address. Place the cursor in the The used alternative depends on the time at which the IP address is available. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 47: Setting Technical Key

    The technical key for an IED object in PCM600 can also be changed in the properties window. IED in the Plant Structure . Select the Set Technical Key , see Right-click and select Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 48 The technical key is read from the IED and the technical key editor window opens, see Figure IEC09000380-1-en.vsd IEC09000380 V1 EN-US Figure 30: PCM600: Technical key editor Technical Key Editor the following selections are possible. Using the 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 49 It is not possible to set a user defined name or select the the same as already given to another IED object in the PCM600 project. A dialog window opens if this is the case. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 51: Protection And Control Engineering

    SMT is not supporting signals of integer type or group signals. So, even if these types of signals are set as visible for SMT, they will not be shown in SMT. • Document the application configuration, for example to make printouts. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 52: Function Blocks

    • Invert Boolean inputs and Boolean outputs. Mandatory signals must be connected. Function blocks with disconnected outputs are not executing and hence may show improper values on the outputs. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 53: Signals And Signal Management

    Signals are located on both sides of the middle position up and down. When there is space left, move some signals up or down for a better visibility and connection routing. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 54: Function Block Execution Parameters

    It is possible to select a pair out of the list. Figure 32 shows an example how the drop down list could look like. IEC08000269.vsd IEC08000269 V1 EN-US Figure 32: ACT: function block organization parameters 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 55 Cycle Time can be selected to 5, 20 or 100 ms. Depending on function block type and the 650 series product only one, two or all three possibilities may be available. Execution Order , Instance Number is predefined by ABB. Mainly for basic logic The combination...
  • Page 56: Configuration Parameters

    A connection is the link or "wire" between function block outputs and inputs. Rules and methods to do connections: • Drag a line between two signals. • Link two signals by using variables. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 57: Hardware Channels

    A hardware input channel can be used as often as it is needed. A hardware binary output channel is taken from the list of available channels when a new channel is requested. That prevents for using a hardware binary output channel twice. As an example, see Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 58: Validation

    A connection between two input signals or two output signals is not possible. • A connection between two different data types is not possible, for example a binary output to an analog input. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 59 Validation when writing to the IED When writing the application configuration to the IED an automatic validation is performed. The validation is the same as the manually demanded validation. Errors will abort the writing. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 60: Setting Configuration And Setting Parameters In Pst

    IED parameters organization The organization of the parameters in a tree structure is visible in the plant structure by expanding the setting tree. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 61: Connecting Signals In Smt

    (OR and AND blocks) between the function blocks and the binary output channel. This can be engineered in SMT. Connections made in SMT are automatically shown in ACT. Connections made in ACT are automatically shown in SMT. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 62 Depending on the IED capability, SMT has a separate sheet for each possible combination. The possible sheets are: • Binary Inputs • Binary Outputs • Analog Inputs • GOOSE Receive 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 63: Local Hmi Engineering

    The function blocks for LHMI are visible by default for Parameter Setting tool. • Use Application Configuration tool to connect start and trip signals from application functions to LED function blocks. • Parameter Setting tool 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 64 LCD [A]. They are operated by the keys [a] and [b]. The other group is the five function keys with their IEDs and the corresponding text elements on the LCD [B]. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 65 Only the programming of the signals is needed for the LEDs. • The operation mode of the LEDs is defined in Parameter Setting tool. Function block FNKEYMD1 to 5 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 66 Each LED can illuminate in one of three colors: RED, YELLOW, GREEN. • Only one color is illuminated at a time. • The priority for illumination and the color is linked. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 67 • The timers are set in Parameter Setting tool in the function block LEDGEN. IEC09000657-1-en.vsd IEC09000657 V1 EN-US Figure 44: LHMI: LED operation mode 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 68: Led Operation Modes

    This is the same mode as Follow-S but the LED illuminates flashing, see Figure 46. This mode may be used to indicate that a tap changer or Petersen coil is moving. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 69 One or more signals with higher priority are changing to • The higher priority color (signal) will illuminate in flash mode. Figure 48 Figure 49 for these two principles. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 70 Figure 50 shows the internal state of the LED following the signal and reset, when no higher prior signal is given. The LED illuminates always in steady mode. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 71 A disturbance runs for a maximum of some seconds, while tReset can be in the range of 60 to 90 seconds. The timer tReset and tMax are configured in Parameter Setting tool as part of the function block LEDGEN 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 72: Single-Line Diagram Engineering

    Concept description to present and generate diagrams in graphical display editor GUID-3C532F5A-3E26-4A3A-ACE3-C7758494BE4D v3 Additional concept information to use GDE, see Figure • Different GDE windows • HMI display raster layouts • Drawing lines (doing a Link) 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 73 All symbol objects, for example apparatus, text and measurement, on the HMI page must be linked to the correct function block in the application configuration in order to present the correct process values. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 74 The text can be presented in two different font sizes: • UniCode characters (6 x 12 pixel), or • UniCode characters (13 x 14 pixel) 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 75 Click to start and move the mouse pointer to the destination connection point. Center once again the mouse pointer and click to drop the line. Draw all line elements that are necessary. Select in the menu bar to finish the line drawing. Click 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 76: Supported Single-Line Diagram Symbols

    Ground Connections Feeder end Connections Current transformer Measuring transformers Voltage transf. 2 windings Measuring transformers Measurand Measurands Capacitor Others Surge arrestor Others Generator Others Table continues on next page 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 77 Truck, 10 = Closed Switchgear Truck, 11 = Undefined Switchgear Isolator indication only, 00 = Middle Switchgear position Isolator indication only, 01 = Open Switchgear Table continues on next page 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 78 Closed Isolator2 indication only, 11 = Switchgear Undefined Breaker2, 00 = Middle position Switchgear Breaker2, 01 = Open Switchgear Breaker2, 10 = Closed Switchgear Table continues on next page 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 79: Bay Configuration Engineering

    HMI page they must be linked to the corresponding function block in the application configuration, which protects or controls the object that the symbol on the HMI page represents. Creating a complete HMI display page Procedure: 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 80 GDE to establish the link for updating the selected data attribute in the HMI of the application function block. The following application function blocks are used to deliver the needed information: 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 81 The number of order in the selection window of the process objects corresponds to the number given in the PST tree and to the application function block in ACT. Only those apparatus and measurements are shown that are configured in the application configuration program. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 82: Events And Indications

    To get IED events to the LHMI event list and indications for LEDs, disturbance report needs to be engineered. Detailed information about disturbance report subfunctions is found in the technical manual. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 83: Iec 61850 Communication Engineering

    IEC 61850. 7.1.2 IEC 61850 interface in IED SEMOD58549-61 v3 Figure 60 for a principle view of the IEC 61850 logical node concept in the IED. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 84: Goose Data Exchange

    Ethernet. Whoever needs the information detects the telegram by its source address and will read the telegram and deals with it. The telegrams are multicast sent and not acknowledged by the receiver. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 85: Station Configuration Description File Types

    Capability description of the IED in logical nodes and their data. No information about communication configuration, for example, is included. • An IED is already extended by default data sets. They are predefined by ABB. Changes or additional data sets, for example, have to be done with CCT600. •...
  • Page 86: Iec 61850 Engineering Procedure

    Configure horizontal and vertical communication in the station configuration tool, for example CCT600. Import SCL files to PCM600 project. In the scenario in Figure 62 it is the updated SCD file. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 87: Exporting Scl Files From Pcm600

    IED, that is to set the IEC61850-8-1 setting to Enabled . 7.3.1 Exporting SCD files GUID-2FDA859B-3761-4310-BEFF-11BB046A406B v1 Procedure to export the SCD file from PCM600: Select the station in the plant structure, see Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 88: Exporting Icd Or Cid Files

    • Configured IED Description (*.cid) for the IEC 61850 structure as needed for the IED at runtime. • IED Capability Description (*.icd) for the IEC 61850 structure, see Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 89: Engineering Of Vertical And Horizontal Communication In Cct600

    Create a project in CCT600. Import the SCD file created by PCM600, see Figure IEC09000628-1-en.vsd IEC09000628 V1 EN-US Figure 67: CCT600 Import SCL file Do vertical communication engineering (monitoring direction). 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 90 Up to 8 report clients can be configured. 3.4. Link the IED clients to the Report Control Blocks. Do horizontal communication engineering. 4.1. Configure GOOSE control blocks for each data set configured for GOOSE messages. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 91: Importing Scl Files To Pcm600

    Select the file to be imported from the open standard Windows menu and start the reading. SCL Import Options window opens, which queries how the file should be handled during import, see Figure IEC09000631-1-en.vsd IEC09000631 V1 EN-US Figure 69: IEC 61850: Import SCD file 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 92 GOOSE communication. Write the configuration to the IED, see Figure Note that the engineered data is written to the IED when executing a common Write to IED operation. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 93: Importing Icd Or Cid Files

    Files of type drop down list (ICD or CID) Select the file type of IEC 61850 to import from the SCL Import Option menu opens, which queries how the file should be handled during import, see Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 94: Writing Communication Configuration To Ied

    IED. Other parts of the configuration will be updated. If no changes have been done in the communication configuration part, click No in the Update Communication window. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 95 1MRK 511 245-UUS A Section 7 IEC 61850 communication engineering IEC09000729-1-en.vsd IEC09000729 V1 EN-US Figure 72: Update the communication configuration in the IED with the configuration made in PCM600 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 97: Iec 60870-5-103 Communication Engineering

    IEC 60870-5-103 function block instance in the Parameter Setting tool. See the Communication protocol manual for IEC 60870-5-103 for more information about the IEC 60870-5-103 implementation in 650 series. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 99: Dnp3 Communication Engineering

    Direct configured hardware channels in the application configuration (see Figure 73) appear in CMT (see Figure 74). Do not configure these hardware channels to be sent by DNP3, as they are not event-handled. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 100 The left window has a drop down menu for signal selection and buttons for signal movement, see Figure IEC08000337.vsd IEC08000337 V1 EN-US Figure 75: CMT: Container window design when selecting DNP3 protocol Procedure to move signals: 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 101: Setting Dnp3 Signal Parameters

    Click the two inner arrows to sort signals to another index sequence, or select from the context menu to move one or a set of signals to another array, see Figure 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 102: Configuring Dnp3 Class

    In DNP3 the user classifies the signals and defines those signals that are not member of any class. CMT has a default predefined organization of classes per signal type. In the master station the 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 103 None and 0 to 3 according to the project Select the signal classes and choose between demands. OK to set the signal classification. Click Write to IED. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 105: Glossary

    Central processor unit Carrier receive Cyclic redundancy check CROB Control relay output block Carrier send 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 106 Electrical and functional description for digital lines used by local telephone companies. Can be transported over balanced and unbalanced lines Communication interface module with carrier of GPS receiver module Graphical display editor within PCM600 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 107 Ingression protection, according to IEC standard, level IP40-Protected against solid foreign objects of 1mm diameter and greater. IP 54 Ingression protection, according to IEC standard, level IP54-Dust-protected,protected againstsplashing water. 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 108 Parameter setting tool within PCM600 PT ratio Potential transformer or voltage transformer ratio PUTT Permissive underreach transfer trip RASC Synchrocheck relay, COMBIFLEX Relay characteristic angle RFPP Resistance for phase-to-phase faults 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 109 FTP, UDP and RDP. TNC connector Threaded Neill-Concelman, a threaded constant impedance version of a BNC connector TPZ, TPY, TPX, TPS Current transformer class according to IEC User management tool 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 110 Three times zero-sequence current. Often referred to as the residual or the -fault current Three times the zero sequence voltage. Often referred to as the residual voltage or the neutral point voltage 650 series Engineering manual © Copyright 2011 ABB. All rights reserved...
  • Page 112 ABB AB Substation Automation Products SE-721 59 Västerås, Sweden Phone +46 (0) 21 32 50 00 Scan this QR code to visit our website www.abb.com/substationautomation © Copyright 2011 ABB. All rights reserved.

Table of Contents