Completing The Test; Breaker Monitoring Sscbr; Verifying The Settings - Hitachi Relion RES670 Commissioning Manual

Phasor measurement unit
Hide thumbs Also See for Relion RES670:
Table of Contents

Advertisement

1MRK 511 409-UUS Rev. K
5.
Activate BLOCK binary input and check that the outputs TEMPALM, TEMPLO, ALARM and
LOCKOUT disappear.
6.
Reset the BLOCK binary input.
7.
Ensure that temperature lockout condition exists and then activate the reset lockout input
RESETLO and check that the outputs TEMPLO and LOCKOUT reset.
11.11.2.4

Completing the test

Continue to test another function or end the test by changing the TestMode setting to Off. Restore
connections and settings to their original values, if they were changed for testing purposes.
11.11.3

Breaker monitoring SSCBR

Prepare the IED for verification of settings outlined in section "Testing the IED operation".
The Signal Monitoring tool in PCM600 shows the service values that are available on the Local HMI as
well.
Values of the logical signals belong to the breaker monitoring are available on the local HMI under: Main
menu/Test/Function status/Monitoring/BreakerMonitoring /SSCBR:x
11.11.3.1

Verifying the settings

1.
Connect the test set for the injection of a three-phase current to the appropriate current terminals of
the IED.
2.
If current need to be injected for a particular test, it should be done in the phase selected by the
PhSel parameter.
3.
Follow the sequence for positioning the auxiliary contacts before testing:
POSCLOSE
POSOPEN
4.
Test of CB contact travel time
4.1. Test the set timing defined by OpenTimeCorr, CloseTimeCorr, tTrOpenAlm and tTrCloseAlm.
4.2. Change the status of the auxiliary contacts such that travel time to open TTRVOP and travel
4.3. Check that TRVTOPAL and TRVTCLAL are activated.
5.
Test of CB status
5.1. Test the set current level defined by AccStopCurr.
5.2. Check the CLOSEPOS output by changing the POSOPEN to 0 and POSCLOSE to 1.
5.3. Check the OPENPOS output by changing the POSOPEN to 1 and POSCLOSE to 0 and also
5.4. Check the circuit breaker is in INVDPOS if auxiliary contacts read same value or CB is open
6.
Test of remaining life of CB
Phasor measurement unit RES670
Commissioning manual
time to close TTRVCL exceed the respective set values (tTrOpenAlm and tTrCloseAlm). The
measured travel time for opening and closing is shown on TTRVOP and TTRVCL respectively.
inject the current in the selected phase slightly lower and higher than AccStopCurr set value.
Only for a current lower than set AccStopCurr should activate the output POSOPEN.
and inject the current in selected phase more than AccStopCurr set value.
© 2017 - 2022 Hitachi Energy. All rights reserved
Testing functionality by secondary injection
0
1
0
0
Section 11
GUID-1A0D8AF0-4C48-45E8-B31D-96734ED1A4D2 v2
GUID-10D26C82-79FF-4EAD-AE4A-2F2DBE965087 v3
GUID-962A344D-5F8D-49A6-B3AC-29C7FEED0A3D v4
0
1
141

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents