Basic Ied Functions; Parameter Setting Group Handling Setgrps; Verifying The Settings - Hitachi Relion RES670 Commissioning Manual

Phasor measurement unit
Hide thumbs Also See for Relion RES670:
Table of Contents

Advertisement

Section 11
Testing functionality by secondary injection
Test the correct functionality by simulating different kind of faults. Also check that sent and received data
is correctly transmitted and read.
A test connection is shown in figure 31. A binary input signal (BI) at End1 is configured to be transferred
through the communication link to End2. At End2 the received signal is configured to control a binary
output (BO). Check at End2 that the BI signal is received and the BO operates.
Repeat the test for all the signals configured to be transmitted over the communication link.
ANSI07000188 V1 EN-US
Figure 31:
11.15

Basic IED functions

11.15.1

Parameter setting group handling SETGRPS

Prepare the IED for verification of settings as outlined in section
11.15.1.1

Verifying the settings

1.
Check the configuration of binary inputs that control the selection of the active setting group.
2.
Browse to the ActiveGroup menu to achieve information about the active setting group.
The ActiveGroup menu is located on the local HMI underMain menu/Test /Function status/
Setting groups /ActiveGroup
148
Test of RTC with I/O
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 511 409-UUS Rev. K
"Preparing for test"
in this chapter.
Phasor measurement unit RES670
Commissioning manual
SEMOD52026-1 v1
M11369-2 v4
M11369-4 v5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents