Guidelines For Planning Electrical Installation; Contents Of This Chapter; Limitation Of Liability; North America - ABB ACS880-7107LC Hardware Manual

Dc feeder units
Hide thumbs Also See for ACS880-7107LC:
Table of Contents

Advertisement

Guidelines for planning electrical installation 21

3
Guidelines for planning electrical
installation

Contents of this chapter

This chapter contains electrical planning instructions.

Limitation of liability

The installation must always be designed and made according to applicable local laws
and regulations. ABB does not assume any liability whatsoever for any installation
which breaches the local laws and/or other regulations. Furthermore, if the
recommendations given by ABB are not followed, the drive may experience problems
that the warranty does not cover.

North America

1)
Installations must be compliant with NFPA 70 (NEC)
and/or Canadian Electrical Code
(CE) along with state and local codes for your location and application.
1)
National Fire Protection Association 70 (National Electric Code).
ABB is not responsible for the energy storage selection or protection of the energy
storage.

Generic guidelines

Refer to
ACS880 liquid-cooled multidrive cabinets and modules electrical planning
instructions (3AXD50000048634 [English])
for the generic guidelines for planning the
electrical installation (selecting cables, routing cables, etc.) of multidrive cabinets and
modules.

Advertisement

Table of Contents
loading

Table of Contents